Installing a new boiler, radiators and the associated controls normally takes between 1 - 5 days.
Typically day 1 is for removing the old boiler and cleaning the central heating system.
Day 2 starts with installing and upgrading central heating system; for example running a larger gas supply from the gas meter to the boiler.
Day 3 is a continuation with more radiators being installed and pipe work connecting the boiler to the radiators.
Day 4 is a further day of installing or starting to commission the boiler and central heating system.
All the rubbish is removed and taken back to our industrial unit.
Several weeks after the boiler is installed you will receive a Gas Safe installation certificate along with a certificate from Worcester Bosch, the manufacturers, for the 5 year parts and labour guarantee.